Follow-up of work constructions NOVO video

Featured Video Play Icon

Present the video fruit of the follow-up of work done during the last winter by commissioned of the company constructions, structures and formwork NOVO in the work of reform and addition of a wing of pool cover, gym and spa in Club Pollentia ressort.

This video was composed from images and video acquired from more than 20 flight sessions spread over the 4 months of learning of the project. Complement them images aerial with video timelapse taken with camera fixed of great angular installed in a point fixed high, to get a nice symbiosis with them tomas air and explain better the process constructive. We automate the flight to get images from the same points along the evolution of the work.

Editing and video montage has been made by Messer Studio.

Leave a Reply

      (+34) 660 829 134